Information for TIP Project Number SA216

All funds are in millions of dollars.
This listing includes the amendment for this project of 6/09.

Project Listings |  Clickable Maps |  Help

Project Description

Church Street (NY 9N), from West Avenue to North Van Rensselaer Street: Reconstruction

This includes a left turn lane, signals, drainage, curbs, sidewalks, streetlights and landscaping.

NYSDOT moved the D phase as shown below.

Construction amount reflects low bid.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2005-07

2007-08

2008-09

2009-10

2010-11

2011-12

Post '12

STP-Flex

0

0.176 P

0

0

0

0

0

STP-Flex

0.010 I

0

0.040 R

0

0

0

0

STP-Flex

0

0.114 D

0

0

0

0

0

Stim

0

0

2.150 C

0

0

0

0

StimNew

0

0

0.656 C

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Engineering

0.290

0.290

Right-of-Way

0.040

0.050

Construction

2.806

2.806

Total

3.136

3.146



Other Information

TIP Number: SA216

Func. Class: UmA

PIN: 1757.14

Length: .53 Ln-Mi

Project Type: Reconst'n

Plan Ref.: HWY Cond

Jurisdiction: City

No EIS Required

Location: Saratoga Springs

Air Quality: Exempt

Implementer: City






CDTC Home Page   |  Site Map