Information for TIP Project Number SA195

All funds are in millions of dollars.
This listing includes the amendment for this project of 7/09.

Project Listings |  Clickable Maps |  Help

Project Description

Zim Smith Mid-County Trail

Convert abandonded D&H railroad corridor into bikeway and trailway.

This includes grading, leveling, paving, roadway crossings, two trailhead endpoints and a new bridge over the Mourningkill

Federal funding for the STP-Enh funds are 80%, with a maximum $0.686M federal share.

The phase funded with Stimulus funds is PIN 1758.62. It was funded with $1.433M, but now reflects low bid.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2005-07

2007-08

2008-09

2009-10

2010-11

2011-12

Post '12

STP-Enh.

0.858 C

0

0

0

0

0

0

StimNew

0

0

0.524 C

0

0

0

0

Local

0

0

0.255 C

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Construction

0.779

1.637

Total

0.779

1.637



Other Information

TIP Number: SA195

Func. Class: NA

PIN: 1756.29

Length: 8.77 miles

Project Type: Bike/Ped

Plan Ref.: NV

Jurisdiction: County

No EIS Required

Location: Multiple

Air Quality: Exempt

Implementer: County






CDTC Home Page   |  Site Map