Project Description
Green Street Connector Sidewalk Reconstruction, Village of Schuylerville Reconstruction of sidewalks along a two block stretch of Green Street, (approx. 2500 square feet) intersecting Saratoga Street and Ferry Street. Federal funding is capped with a maximum of $0.024M. This project was funded as RG41 from the 2002-03 FFY.
Reconstruction of sidewalks along a two block stretch of Green Street, (approx. 2500 square feet) intersecting Saratoga Street and Ferry Street. Federal funding is capped with a maximum of $0.024M. This project was funded as RG41 from the 2002-03 FFY.
Federal funding is capped with a maximum of $0.024M. This project was funded as RG41 from the 2002-03 FFY.
This project was funded as RG41 from the 2002-03 FFY.
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
2005-07
2007-08
2008-09
2009-10
2010-11
2011-12
Post '12
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Construction
Total
Other Information
TIP Number: SA190
Func. Class: NA
PIN: 1756.18
Length: .14 Cl-Mi
Project Type: Bike/Ped
Plan Ref.: NV
Jurisdiction: Village
No EIS Required
Location: Schuylerville
Air Quality: Exempt
Implementer: Village