Information for TIP Project Number SA190

All funds are in millions of dollars.
This listing includes the amendment for this project of 09/07 and 09/09.

Project Listings |  Clickable Maps |  Help

Project Description

Green Street Connector Sidewalk Reconstruction, Village of Schuylerville

Reconstruction of sidewalks along a two block stretch of Green Street, (approx. 2500 square feet) intersecting Saratoga Street and Ferry Street.

Federal funding is capped with a maximum of $0.024M.

This project was funded as RG41 from the 2002-03 FFY.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2005-07

2007-08

2008-09

2009-10

2010-11

2011-12

Post '12

STP-Flex

0

0.032 C

0

0

0

0

0

STP-Flex

0

0

0

0.030 C

0

0

0

Local

0

0.008 C

0

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Construction

0.070

0.070

Total

0.070

0.070



Other Information

TIP Number: SA190

Func. Class: NA

PIN: 1756.18

Length: .14 Cl-Mi

Project Type: Bike/Ped

Plan Ref.: NV

Jurisdiction: Village

No EIS Required

Location: Schuylerville

Air Quality: Exempt

Implementer: Village






CDTC Home Page   |  Site Map