Information for TIP Project Number SA181

All funds are in millions of dollars.
This listing includes the amendment for this project of 9/09.

Project Listings |  Clickable Maps |  Help

Project Description

Spring Run Trail Construction

Construct Trail from East Avenue to I-87.

This project also includes several feeder trails to city streets.

The federal portion of the federal funding is 80%, with a maximum of $0.358M in federal funds. The project was funded with the requirement of at least a 50% local match instead of the normal 20%.

This project has multiple PIN's

Cost reflects low bid




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2005-07

2007-08

2008-09

2009-10

2010-11

2011-12

Post '12

Stim

0

0

0.448 C

0

0

0

0

StimNew

0

0

1.339 C

0

0

0

0

Local

0.326 D

0

0

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Engineering

0

0.326

Construction

1.787

1.787

Total

1.787

2.113



Other Information

TIP Number: SA181

Func. Class: NA

PIN: 1755.93

Length: 1.25 cl-mi

Project Type: Bike/Ped

Plan Ref.: NV

Jurisdiction: City

No EIS Required

Location: Saratoga Springs

Air Quality: Exempt

Implementer: City






CDTC Home Page   |  Site Map