Project Description
NY 9N Bridge over the Hudson River: Bridge Replacement The cost is split between CDTC and AGFTC. The cost shown is half the total cost.
The cost is split between CDTC and AGFTC. The cost shown is half the total cost.
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
2005-07
2007-08
2008-09
2009-10
2010-11
2011-12
Post '12
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Engineering
Construction
Total
Other Information
TIP Number: SA152
Func. Class: RmA
PIN: 1116.43
Length: NA
Project Type: Br.Replace
Plan Ref.: GOP
Jurisdiction: State
No EIS Required
Location: Hadley
Air Quality: Exempt
Implementer: NYSDOT