Information for TIP Project Number SA104

All funds are in millions of dollars.
This listing includes the amendment for this project of 9/08 and 3/10.

Project Listings |  Clickable Maps |  Help

Project Description

Batchellerville Bridge (CR 98): Bridge Replacement

This project inculdes temporary repairs funded with HBRR Discretionary, that were project SA208 from the 2003-08 TIP.

Saratoga County will own the bridge upon completion of construction. The HBRR-NY funds were added to the Region One allocation. NYSDOT will pay the match.

HBRR-NY & HBRR-100 are 100% federal as the match is paid with toll credits.

NYSDOT increased R, added I and adjusted C.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2005-07

2007-08

2008-09

2009-10

2010-11

2011-12

Post '12

HBRR

0.025 I

0

0

2.156 C

0

0

0

HBRR-NY

0

0

0

30.983 C

0

0

0

HBRR-Dis

0.911 R

0

0

3.261 C

0

0

0

HBRR-100

0

0

0

20.000 C

0

0

0

Bond83

0

0

0

1.600 C

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Right-of-Way

0

0.936

Construction

58.000

58.000

Total

58.000

58.936



Other Information

TIP Number: SA104

Func. Class: RMC

PIN: 1753.63

Length: 3.9 Ln-Mi

Project Type: Br.Replace

Plan Ref.: NV

Jurisdiction: County

No EIS Required

Location: Edinburgh

Air Quality: Exempt

Implementer: NYSDOT






CDTC Home Page   |  Site Map