Project Description
Mohawk/Hudson Bike Trail Crossing at NY 5S The scope includes bollards, signage, and flashing beacons. Federal funding is 80%, with a maximum of $0.118M. This project was funded via RG103 .
The scope includes bollards, signage, and flashing beacons. Federal funding is 80%, with a maximum of $0.118M. This project was funded via RG103 .
Federal funding is 80%, with a maximum of $0.118M. This project was funded via RG103 .
This project was funded via RG103 .
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
2005-07
2007-08
2008-09
2009-10
2010-11
2011-12
Post '12
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Engineering
Construction
Total
Other Information
TIP Number: S187
Func. Class: UmA
PIN: 1757.97
Length: NA
Project Type: Bike/Ped
Plan Ref.: NV
Jurisdiction: County
No EIS Required
Location: Schenectady
Air Quality: Exempt
Implementer: County