Information for TIP Project Number S177

All funds are in millions of dollars.
This listing includes the amendment for this project of 4/09 and 09/09.

Project Listings |  Clickable Maps |  Help

Project Description

Erie Boulevard, from Liberty Street to I-890: Reconstruction

This includes redesign of the road with signal, drainage, curbs, sidewalks, parking, median and intersection treatments and streetscaping.

The schedule shown for Demo funding assumes NYSDOT willingness & ability to use spending flexibility. The Demo funds extend the limit from State Street to Liberty Street and, if funds permit, to Union Street.

NYSDOT added the I phase shown below.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2005-07

2007-08

2008-09

2009-10

2010-11

2011-12

Post '12

NHS

0

0

2.070 R

0

0

0

0

NHS

0

0.060 I

0

0

0

0

0

NHS

0

0

0

0.930 R

8.440 C

0

0

Demo.

0.540 D

0

0

0

0

0

0

Demo.

0.500 P

0

0

0

0

1.460 C

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Engineering

0

1.040

Right-of-Way

3.060

3.060

Construction

9.900

9.900

Total

12.960

14.000



Other Information

TIP Number: S177

Func. Class: UPA

PIN: 1757.16

Length: 3.6 Ln-Mi

Project Type: Reconst'n

Plan Ref.: HWY Cond

Jurisdiction: City

No EIS Required

Location: Schenectady

Air Quality: Exempt

Implementer: City






CDTC Home Page   |  Site Map