Project Description
Patroon Island Bridge Repairs This is for a floor beam retrofit to fix cracking in the floor beams. Funding is split with A507 .
This is for a floor beam retrofit to fix cracking in the floor beams. Funding is split with A507 .
Funding is split with A507 .
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
2005-07
2007-08
2008-09
2009-10
2010-11
2011-12
Post '12
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Engineering
Construction
Total
Other Information
TIP Number: R293
Func. Class: NA
PIN: 1528.79
Length: NA
Project Type: BridgeMisc
Plan Ref.: NV
Jurisdiction: State
No EIS Required
Location: Multiple
Air Quality: Exempt
Implementer: NYSDOT