Information for TIP Project Number A502

All funds are in millions of dollars.
This listing includes the amendment for this project of 7/08 and 09/09.

Project Listings |  Clickable Maps |  Help

Project Description

Meads Lane/Van Dyke Road Intersection: Upgrade/Realignment

Adjust horizontal alignment of Van Dyke Road and vertical alignments of both roads including pavement markings and relocation/removal of fixed objects.

Federal funding is 90%, with a maximum of $0.500M.

This project was funded via RG105 .




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2005-07

2007-08

2008-09

2009-10

2010-11

2011-12

Post '12

Safety

0

0

0.140 P

0

0

0

0

Safety

0

0

0.025 R

0

0

0

0

Safety

0

0

0

0.391 C

0

0

0

Local

0

0

0

0.147 C

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Engineering

0.140

0.140

Right-of-Way

0.025

0.025

Construction

0.538

0.538

Total

0.703

0.703



Other Information

TIP Number: A502

Func. Class: UL

PIN: 1758.02

Length: NA

Project Type: Safety

Plan Ref.: NV

Jurisdiction: Town

No EIS Required

Location: Bethlehem

Air Quality: Exempt

Implementer: Town






CDTC Home Page   |  Site Map