Project Description
Sheridan Hollow Sidewalks Sidewalks along both sides of Orange St., the north side of Monroe St., and the north side of Sheridan Ave. Federal funding is 80%, with a maximum of $0.272M. This project was funded via RG103 .
Sidewalks along both sides of Orange St., the north side of Monroe St., and the north side of Sheridan Ave. Federal funding is 80%, with a maximum of $0.272M. This project was funded via RG103 .
Federal funding is 80%, with a maximum of $0.272M. This project was funded via RG103 .
This project was funded via RG103 .
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
2005-07
2007-08
2008-09
2009-10
2010-11
2011-12
Post '12
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Engineering
Construction
Total
Other Information
TIP Number: A500
Func. Class: UL
PIN: 1757.95
Length: 1842 linear feet
Project Type: Bike/Ped
Plan Ref.: NV
Jurisdiction: City
No EIS Required
Location: Albany
Air Quality: Exempt
Implementer: City