McKown Road from Western Avenue to
Woodscape Drive: New Sidewalk
Construction of a new sidewalk along
the south side of McKnown Road
Federal funding is 80%, with a maximum
$0.052M federal share.
This project was funded via RG41
from
the 2003-06 period and will be bundled
with A423
.
|