List of 2005-10 TIP Projects in TIP Order


TIP Number

PIN

Truncated Description

RG1

NA

Park and Ride Lots for Carpools Set-Aside
RG15

Multiple

Durable Pavement Markings Set-Aside
RG16

Multiple

State Bridge Inspection Set-Aside
RG22

Multiple

Local Bridge Inspection Set-Aside
RG23

Multiple

Traffic Signal Set-Aside
RG27

1T05.02

Travel Demand Management
RG28

1806.60

Intelligent Transportation System (ITS) Implementation Set-Aside
RG29

1755.63

CDTC Technical Services
RG31

1821.44

Corridor Management Initiative
RG37

1806.61

HELP Program
RG37A

1806.60

TMC Operating Costs
RG39

Multiple

ITS Set-Aside for Local Traffic Signals
RG40

Multiple

Grade Crossing Safety Improvements Set-Aside
RG41

Multiple

Spot Improvements for Bicycle and Pedestrian Access Set-Aside
RG96

1RTP.01

Recreational Trails Projects
RG97

1SB1.04

Mohawk Towpath Guide Book & Web Design
RG98

1SB2.04

Mohawk Towpath Interpretive Signage
RG99

1807.03

ITS Elements & Transmit Systems for Capital District Interstates
RG100

NA

Transit Pilot Service Set-Aside
RG101

1SB5.94

Mohawk Towpath Byway Trail Link
RG106

Scenic Byways Block Funds
T6A

1824.01

Elderly and Handicapped Vehicles
T6B

1820.37

STAR Buses Replacement
T9

1820.50

Facility Improvements
T11

1821.18

Passenger Facility Improvements at Various Locations
T14A

1824.03

Transit Operations Support
T14B

Transit Operations Support for Saratoga Service: Preventive Maintenance
T16

1821.80

Transit Support Vehicles
T17

1820.48

Transit Bus Replacement
T36

1TR6.03

Contingencies, Administration and Planning for CDTA Projects
T57

1TR6.04

Preventive Maintenance
T59

1820.57

Replacement Shuttle Vehicles
T62

1TR6.05

Information Systems
T64

1TR6.06

Customer Information Systems
T66

1823.01

Welfare to Work
T66A

1823.01

Welfare to Work in Saratoga Springs
T69

**

NY 5 Bus Rapid Transit (BRT) Vehicles
T70

**

NY 5 Bus Rapid Transit (BRT) Stations
T72

1820.61

Safety and Security
T73

**

This project was combined with T77.
T74

1TR6.02

Park & Ride Lots in NY 5 Corridor
T75

**

Transit Signal Priority on NY 5, Between and in the Cities of Albany
T76

1824.05

Replacement Transit Buses for Saratoga Service
T77

Preventative Maintenance for Adirondack Trailways' Commuter Services in the
T78

Hybrid Electric Buses
T79

New Freedom Tranist Service
T79A

New Freedom Tranist Service In Saratoga Springs
A196

1306.47

NY 7 Bridge over I-890: Bridge Replacement
A198

1306.50

NY 7 Bridge over I-87 (Exit 6): Bridge Reconstruction, and
A199

1460.37

NY 32 Bridge over D&H Railroad at Wards Lane: Bridge Repairs
A229

1528.52

I-90, from Patroon Island Bridge to Exit 5A (Bridge over CSX Spur):
A237

1753.09

Everett Road, from Albany Shaker Road to Exchange Street: Corridor Improvements
A240

1721.51

I-87 Exit 3 or 4 Airport Connector
A242

1125.24

Slingerlands Bypass (NY 85) Phase 2
A243

1125.19

Slingerlands Bypass (NY 85) Phase 3
A265

1006.07

NY 143, from NY 9W to Coeymans' Hollow: Reconstruction
A275

1753.34

Albany Shaker Road, from NY 7 to Watervliet Shaker Road: Expand from Two
A286

B109

Old State Road Bridge over the Thruway (Milepost 150.81): Bridge Replacement
A289

1753.36

Grade Separation of Lincoln Avenue and Amtrak Tracks
A290

1347.07

Selkirk Bypass
A295

1753.60

New Karner Road (NY 155), from US 20 to NY 5: Corridor Improvments
A296

1753.37

Relocation of Maxwell Road Part 1: Albany Shaker Road Intersection
A315

1051.50

I-787, from US 9W to the South Mall Expressway: Resurfacing
A319

1528.55

I-90, from Thruway to Exit 5A (Bridge over CSX Spur): Rehabilitation of
A341

1754.45

Central Avenue (NY 5), from City Limits to Everett Road: Resurfacing
A342

1754.46

Morris/Cordell Grade Crossing Consolidation and Separation
A343

1754.47

Airport Cargo Facility Access
A345

1754.49

Elm Street Bypass
A349

1125.25

NY 85 Bridge Over the Normanskill Creek: Bridge Replacement
A368

1804.92

NY 910E (New Scotland Road) over the Normanskill: Bridge Replacement
A372

1754.04

Watervliet Shaker Road, from Karner Road to Albany Shaker Road: Corridor
A375

1721.60

I-87, from Exit 1 to the Saratoga County Line: Reconstruction
A377

1754.67

Village of Voorheesville Pedestrian Circulation
A392

1754.91

Relocation of Maxwell Road Part 2: Wolf Road Service Road
A393

1755.02

Dunbar Hollow Bridge over the Hannacrois Creek: Bridge Reconstruction or
A394

1935.49

NYSDOT/Amtrak Rail Initiative: Livingston Avenue Bridge Rehabilitation
A395

1935.52

NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track.
A398

1002.10

NY 85A Bridge over Vly Creek: Bridge Reconstruction or Replacement
A400

1754.74

Old Ravena Road Bridge over CSX: Bridge Replacement or Reconstruction
A401

1755.23

CR 53 (Jericho Road) Bridge over Dowerskill: Bridge Reconstruction or
A406

1755.61

Albany County Sign Management
A407

1755.62

City of Albany Sign Management
A408

1755.40

Old Ravena Road over CSX; Bridge Replacement or Reconstruction
A411

1755.74

Cohoes Bike Racks
A413

1755.76

Green Island Bridge Sidewalks
A416

1460.42

NY 32 Bridge over the Mohawk River: Bridge Replacement
A420

1756.06

New Scotland Road, City line to Thruway: Reconstruction
A422

1756.17

Voorheesville Railroad Crossing
A423

1756.19

Carman Road Sidewalks
A424

1756.05

Cannon Street Reconstruction
A425

1756.32

Mohawk-Hudson Bike-Hike Trail: Widening and Resurfacing
A426

1722.14

Thruway, Milepost 121.2 to 134.9: 1 Coat Mill & Inlay Pavement Rehabilitation
A427

1722.15

Thruway Exit 23: Pavement Repairs
A428

1722.19

Thruway, Milepost 134.9 to 146.0: 1 Coat Mill & Inlay Pavement Rehabilitation
A429

H855

Thruway, Milepost 800.0 to 801.8: Pavement Rehabilitation
A431

1755.19

Gifford Hollow Over Switzkill: Bridge Replacement
A432

1756.35

Bridge Avenue Bridge Over Mohawk River: Bridge Replacement
A433

1756.38

CR 53 (Old School Road) Bridge over CSX Selkirk Yard: Bridge Replacement
A434

1806.45

Washington Avenue over NY 85: Bridge Replacement
A435

1756.63

ITS Transit Signal Priority on Washington and Western Avenues
A436

1111.35

Western Avenue, Fuller Road to Albany City Line: Sidewalk Construction
A437

1757.38

Mohawk-Hudson Bike-Hike Trail: Bridge Rehabilitation
A438

1756.59

19th Street, from City Line to Congress Steet Bridge: Reconstruction
A440

1756.61

Delaware Avenue, from Madison Avenue to Thruway Bridge: Reconstruction
A441

NA

Watervliet Skaker Road & Old Wolf Road: Roundabout
A444

1756.80

Port of Albany Security Improvements
A445

1756.98

Central Avenue Safety Improvements
A446

1757.03

Mohawk-Hudson Bike-Hike Trail from US 9 to Cohoes City Line: Paving
A447

1757.04

McKown Road from Western Avenue to Woodscape Drive: New Sidewalk
A448

1043.46

US 9 Bridge over Country Road: Ramp Repair
A449

1045.13

NY 378 Bridge Over Hudson River Shore: Rehabilitation
A450

1051.53

I-787, from Broadway to NY 378: Resurfacing
A451

1051.57

I-787, NYS Thruway Exit 23 to South Mall Expressway Complex: Resurfacing
A452

1721.89

I-87, from Western Avenue to the Saratoga County Line: Rehabilitation
A453

Watervliet Shaker Road, from Karner Road to Albany Shaker Road: Corridor
A454

H2173.1

Thruway Exit 25 (Schenectady): Interim Plaza & Ramp Pavement Rehabilitation
A455

H2034.1

Thruway Exit 23 to Exit 24: Pavement Reconstruction & Mobility Improvements
A456

B915.1

Thruway Exit 25 (Schenectady): Bridge Replacement
A457

H2034.2

Albany Corridor Interchanges: Interchange Pavement Rehabilitation
A458

H2034.3

Thruway Exit 24 to Exit 25: Pavement Reconstruction & Mobility Improvements
A459

H2191.1

Thruway, Milepost 121.2 to 141.3: 1 Coat Mill & Inlay Pavement Rehabilitation
A460

S037.00

Operational Subsidy for Container Shipments
A461

1757.31

Intersection of Fuller Road and Washington Avenue
A462

**

Queue Jumper at the Intersection of Central Avenue and New Karner Road
A463

**

Queue Jumper at the Intersection of Central Avenue and Wolf Road
A464

1757.32

Helderberg Hudson Rail Trail: Phase 1 (Vooreesville to the Port of Albany)
A465

1757.33

Guilderland Center Pedestrian Safety
A466

1757.34

Westmere Corridor Pedestrian Improvements
A467

1755.35

Grant Hill Road Bridge Over Normanskill: Bridge Replacement
A468

1051.58

I-787 Northbound Ramp to South Mall Expressway Westbound Access Road
A469

1755.34

Pictuay Road Bridge Over Coeyman's Creek: Bridge Replacement
A470

1125.17

NY 85 Bridge over Berkshire Blvd.: Bridge Replacement
A471

1935.57

Port of Albany Rehabilitation, Operational Improvments and Maintenance
A473

1756.86

Albany Waterfront/Corning Preserve Improvements
A474

1935.57

This project was combined with A471.
A475

H1034.3

Service Area Truck Parking Expansion: Guilderland, Mohawk and Pattersonville
A476

1757.41

Siena College Perimeter Loop Road
A477

Green Island Traffic Signals
A478

1757.62

Euclid Avenue Sidewalks
A479

1757.63

Western Gateway Speed Table
A480

1757.64

Elsmere Avenue and Feura Bush Road Sidewalks
A481

1ME0.19

State Street, Eagle Street to Broadway: Resurfacing
A492

Erie Canal Heritage Trail
A493

1051.67

South Mall Expressway Access Ramps: To and From I-787
A494

1836.43

Dunn Memorial Bridge: Overhead Signs
R111

1306.74

NY 7, from McChesney Avenue to NY 142: Reconstruction and Hoosick Street
R134

1188.27

NY 67 Bridge over the Champlain Canal and Hudson River: Bridge Rehabilitation
R135

1086.23

NY 43 over Tsatsawassa Creek: Bridge Replacement
R155

1753.39

NY 2, from 11th Street to Pawling Avenue/Brunswick Road: Reconstruction
R173

1089.62

I-90 Exit 8 Connector Phase 2: ITS Demonstration.
R175

1754.51

ITS Signal Upgrades at Two Locations
R178

1754.52

Troy-Menands Bridge Pedestrian and Bicycle Access
R184

1130.60

NY 22 Bridge over the Walloomsac River: Bridge Replacement
R185

1130.63

NY 22 Bridge over Kinderhook Creek: Bridge Replacement
R186

1306.61

NY 7 Bridge over Hoosick River: Bridge Replacement
R187

1306.62

NY 7, from Raymertown to Tomhannock Resevoir: Reconstruction
R192

1754.02

Hansen Road Bridge over the B&M Railroad: Bridge Replacement
R195

1754.59

South Troy Industrial Park Road
R196

1754.68

CR 111 (Pitts-Johns Road) Bridge over the Hoosick River: Bridge Restoration
R197

1754.69

Washington Avenue, from I-90 Exit 8 to Broadway: Sidewalk Renovation
R198

1754.70

New Sidewalks on the East Side of Brookside Avenue and at the Intersection
R202

1755.03

56 Road Bridge over Poestenkill Creek: Bridge Replacement
R203

1754.99

CR 40 (Plank Road) Bridge over the Poestenkill Creek: Bridge Replacement
R204

1755.04

CR 3 (South Schodack Road) Bridge over CSX: Bridge Replacement
R206

1935.51

NYSDOT/Amtrak Rail Initiative: Rensselaer Amtrak Shop Construction
R207

1941.16

NYSDOT/Amtrak Rail Initiative: Track Improvements in Rensselaer County
R208

1755.25

Cropsey Road Bridge over Poestenkill Creek: Bridge Replacement or
R209

1755.24

Powers Road Bridge over Poestenkill Creek: Bridge Replacement or
R219

1755.42

ITS Signal Improvements in the City of Troy
R223

1755.66

Troy Pedestrian Bicycle Trail
R224

1528.65

I-90, Exit 10 to Thruway Exit B1: Resurfacing
R229

1756.31

Sherwood Avenue in East Greenbush, US 9 & 20 to Red Mill Road: Sidewalk
R230

B130.1

Castleton Bridge on Thruway: Rehabilitation of Substructure
R231

B131.1

Castleton Bridge on Thruway: Mitigation of Footing Erosion
R232

B418.1

Castleton Bridge on Thruway: Steel Repairs on Approach Spans & Repair
R233

B430.1

Castleton Bridge on Thruway: Rehabilitate Underbridge Access Tram
R234

B136.1

Interchange B1 over Thruway: Bridge Replacements
R236

1036.01

NY 351 over Poestenkill: Bridge Replacement
R238

1043.34

US 9 over NY 9J and US 9 over AMTRAK & CSX: Bridge Replacement
R239

1188.33

NY 67 Bridge over Hoosick River: Bridge Replacement
R240

1755.20

Brookside Avenue over Wynantskill: Bridge Replacement
R241

1755.31

CR 49 (East Union) Over Unnamed Creek: Bridge Replacement
R242

1756.37

Spring Avenue Over Poestenkill: Bridge Replacement
R243

1756.42

Broadway Over AMTRAK Service Road: Bridge Rehabilitation
R244

1756.70

ITS Signal Improvements in the City of Troy Phase 2
R245

1756.62

NY 2, from 5th Avenue to 11th Street: Reconstruction
R246

1089.64

US 4 over the Hudson River: Bridge Replacement
R247

1722.18

Berkshire Spur, Milepost 806.4 to 808.9: Resurfacing
R248

**

9th Street Gateway Streetscape
R249

**

First Alley Connector Sidewalk
R250

**

NY 151: Flashing Beacons
R251

1757.01

Scott Avenue (NY 150), from Prins Way to Ransom Avenue: Sidewalk Rehabilitation &
R252

H81.1

Thruway Exit B1: Plaza Pavement & Ramp Rehabilitation
R253

B916.1

NY 203 (Eastbound & Westbound) Bridges Over Thruway: Bridge Replacements
R254

1757.15

Broadway, from US 20 to Broadway Viaduct Bridge: Reconstruction
R255

1757.35

Route 20 Corridor Bike/Ped Improvements
R256

1757.08

Caretaker Bridge Over Walooomsac River
R257

1755.36

NY 43 over East Street: Bridge Rehabilitation
R258

1130.66

NY 22 Bridge over Dill Brook: Bridge Replacement
R259

1757.20

CR 26 Bridge over Black Brook: Bridge Replacement
R260

1757.21

Sand Bank Road Bridge over the Little Hoosic River: Bridge Replacement
R261

1757.22

Elm Street Bridge over the Little Hoosick River: Bridge Replacement
R262

1757.37

Park & Ride Lots in US 20 Corridor
R263

1528.77

I-90, from Patroon Island Bridge to Exit 10: Mill & Fill
R264

1MS001.30A

New Access Road: School Campus to 10th Street
R265

1932.76

South Rensselaer County Port Connector
R267

Luther Road (NY 151): Ped/Bike Access Improvements
R274

1089.65

ITS Demo, Part 2: Research by RPI into ITS Methods
R275

1089.70

ITS Integration Component
SA48

1188.21

NY 67 Bridge over I-87 Exit 12: Bridge Reconstruction
SA57

1460.33

NY 32 Bridge over Barge Canal: Bridge Rehabilitation
SA70

1188.26

NY 67 Bridge over Abandoned Delaware & Hudson Line: Bridge Reconstruction
SA73

1753.31

CR 52 Bridge over the Glowgee Creek: Bridge Replacement
SA84

1089.54

US 4 Bridge over the D&H Railroad: Bridge Reconstruction
SA88

1096.18

NY 50, North of Saratoga Springs: Reconstruction
SA101

1757.02

Ushers Road and Vischer Ferry Road
SA104

1753.63

Batchellerville Bridge (CR 98): Alternatives Analysis and Preliminary
SA108

1085.27

Balltown Road, from River Road to Glenridge Road: Corridor Improvements
SA109

1804.42

Glenridge Road, from Maple Avenue to NY 146: Reconstruction
SA122

1721.56

I-87 Bridge over the D&H Railroad North of Saratoga Springs: Bridge Replacement
SA132

1754.54

CR 7 (South Shore Road) over Batcheller Creek: Bridge Replacement
SA133

1754.55

South Broadway/Ballston Avenue Intersection Improvements
SA134

1821.66

Replacement Buses for Upstate Transit Northway Commuter Service
SA136

1754.57

Saratoga Springs Downtown Pedestrian Improvements
SA142

1089.58

US 4, in the Village of Schuylerville: Reconstruction
SA147

1721.74

Kinns Road Bridge over I-87: Bridge Replacement
SA152

1116.43

NY 9N Bridge over the Hudson River: Bridge Replacement
SA164

1821.71

Scenic Train: Corinth to North Creek
SA176

1755.16

Ralph Street Bridge over Kayderosseras Creek
SA181

1755.93

Spring Run Trail Construction
SA185

1188.31

NY 67 from I-87 to NY 50: Resurfacing
SA194

1755.99

Hadley Train Station
SA195

1756.29

Zim Smith Mid-County Trail
SA196

1756.30

Historic Hadley Bow Bridge: Preservation
SA198

1247.08

NY 9P over Saratoga Lake Outlet: Bridge Replacement
SA199

1756.23

Bryant's Bridge Road Bridge over Fish Creek: Bridge Replacement
SA200

1754.56

Canal Road Bike Path
SA201

1756.60

Ballston Avenue, from Union Street to Hamilton Street: Safety Improvements
SA202

1941.18

Saratoga Springs to Corinth: Track Purchase and Rehabilitation
SA203

1941.17

Test of Saratoga Station Power Switches
SA206

1721.88

I-87 Bridge over Mohawk River: Replacement of Two Bridges
SA209

1722.12

I-87, Exit 15 to Hudson River: Resurfacing
SA210

1807.01

Northway Access Feasibility Study
SA211

C67.1

Rehabilitation of Lock E-6
SA212

1756.79

Hudson Crossing Multi-Use Path
SA213

**

South Street from Hudson View Cemetary to Talmadge Park: Sidewalk Replacement
SA214

1722.05

I-87, Exit 13 to Exit 15: Resurfacing
SA215

1722.22

Malta Avenue (CR 63) Bridge Over I-87: Superstructure Replacement
SA216

1757.14

Church Street (NY 9N), from West Avenue to North Van Rensselaer Street:
SA217

1757.36

Crescent Road Bike and Pedestrian Improvements
SA218

**

Saratoga County Van Pool
SA220

1756.40

CR 7 Stewart Dam Bridge Over the Sacandaga Reservoir: Bridge Replacement
SA221

1757.07

CR 43 (Geyser Road) Bridge Over D&H Railroad: Bridge Replacement
SA222

1757.09

CR 45 (Northline Road) Bridge over Kayderosseras: Bridge Replacement
SA223

1757.10

US 4 (Central Avenue) Bridge Over the Anthony Kill: Bridge Replacement
SA224

1756.44

CR 4 Over Hudson River: Bridge Rehabilitation
SA225

**

Commercial Access Highway Improvements
SA226

1757.49

Commercial Access Highway Improvements: Two Roundabouts
SA227

1757.55

Commercial Access Highway Improvements: Round Lake Gateway
SA228

1757.53

Commercial Access Highway Improvements: Reconstruction of Cold Spring Road from
SA229

1757.48

Stabilizing of Brookwood Road
SA230

1757.65

Champlain Canal Trail
SA231

1757.66

Halfmoon Physically-Challenged Fishing Access
SA232

1757.67

Community Center NY 9 Spur
SA238

Erie Canal Towpath Community Connector
SA239

Town of Milton Sidewalks & Curbs
S93

1306.51

NY 7 at the Five Corners: Intersection Improvements
S94

1306.78

NY 7 and NY 146: Intersection Improvements at the Intersection
S96

1085.27

Balltown Road, from River Road to Glenridge Road: Corridor Improvements
S97

1096.19

NY 50, Freeman's Bridge Road to Glenridge Road: Corridor Improvements
S120

1804.42

Glenridge Road, from Maple Avenue to NY 146: Reconstruction
S124

1525.29

I-890, from Campbell Road to Exit 26: Reconstruction
S126

1096.21

NY 50 Bridge over the Indiankill: Bridge Replacement
S129

1021.29

NY 159 Bridge over CSX: Bridge Replacement
S143

1754.66

Bicycle and Pedestrian Path Near Lock 8
S150

1935.52

NYSDOT/Amtrak Rail Initiative: Rensselaer to Schenectady Double Track
S155

1755.79

Scotia Sidewalks
S157

1756.01

Maple Avenue Realignment
S158

1357.12

I-88 Resurfacing Part 2: NYS Thruway Exit 25A to Weaver Road
S160

1755.91

Mohawk-Hudson Bike-Hike Trail
S161

1756.28

Glenville & Scotia Sidewalks
S163

1528.75

Thruway Milepost 163.3 to 170.0: Pavement Rehabilitation
S164

H76

Thruway Milepost 163.3 to 170.0: Drainage Improvements
S165

1941.22

Mohawk-Hudson Bike-Hike Trail: Rotterdam Junction to Amsterdam
S166

1306.66

NY 7 over Normanskill: Bridge Replacement
S167

1755.33

Oak Street over CSX: Bridge Replacement
S168

1805.68

Ferry Road over Backchannel Mohawk: Bridge Replacement
S170

1941.19

Western Gateway Transportation Center
S171

1941.21

Rehabilitation at Lock E-8
S172

1306.72

NY 7, I-890 to Saint David’s Lane:
S173

H2174.1

Thruway, Milepost 153.8 to 158.8: Pavement Rehabilitation
S174

C239.1

Lock E-9, Moveable Dam #5: Steel Repairs
S175

1755.37

CR 103 (Pangburn Road) Bridge Over Normanskill: Bridge Replacement
S176

R42.1

Schenectady Trail Rehabilitation
S177

1757.16

Erie Boulevard, from State Street (NY 5), to I-890: Reconstruction
S178

1306.76

NY 7 Bridge Over I-890: Bridge Replacement
S179

1357.13

CR 66 Bridge Over I-88: Bridge Deck & Rehabilitation
S180

1525.33

I-890 Culvert Repair or Replacement
S181

1021.30

NY 159 Bridge over the Poentickill: Bridge Replacement






CDTC Home Page   |  Site Map