Project Description
Town of Milton Sidewalks & Curbs This includes grading, leveling, paving, roadway crossings, two trailhead endpoints and a new bridge over the Mourningkill Federal funding is 80%, with a maximum $1.094M federal share.
This includes grading, leveling, paving, roadway crossings, two trailhead endpoints and a new bridge over the Mourningkill Federal funding is 80%, with a maximum $1.094M federal share.
Federal funding is 80%, with a maximum $1.094M federal share.
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
2003-05
2005-06
2006-07
2007-08
2008-09
2009-10
Post '10
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Construction
Total
Other Information
TIP Number: SA239
Letting Date: FFY '07
PIN: NA
Func. Class: NA
Project Type: Bike/Ped
Length: NA
Jurisdiction: Town
Plan Ref.: NV
Location: Milton
No EIS Required
Implementer: Town
Air Quality: Exempt