Project Description
ITS Signal Improvements in the City of Troy Most of the signals in Troy's Second Avenue corridor will be replaced with signals capable of being coordinated and using "smart" technology. This project was a drawdown on project RG39 , ITS Set-Aside for Local Traffic Signals.
Most of the signals in Troy's Second Avenue corridor will be replaced with signals capable of being coordinated and using "smart" technology. This project was a drawdown on project RG39 , ITS Set-Aside for Local Traffic Signals.
This project was a drawdown on project RG39 , ITS Set-Aside for Local Traffic Signals.
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
2003-05
2005-06
2006-07
2007-08
2008-09
2009-10
Post '10
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Engineering
Construction
Total
Other Information
TIP Number: R219
Letting Date: 12/03
PIN: 1755.42
Func. Class: NA
Project Type: Traff Op'n
Length: NA
Jurisdiction: City
Plan Ref.: NV
Location: Troy
No EIS Required
Implementer: City
Air Quality: Exempt