Project Description
Mohawk-Hudson Bike-Hike Trail from US 9 to Cohoes City Line: Paving Federal funding is 80%, with a maximum $0.014M federal share. This project was funded as a drawdown on RG41 from the 2003-06 period.
Federal funding is 80%, with a maximum $0.014M federal share. This project was funded as a drawdown on RG41 from the 2003-06 period.
This project was funded as a drawdown on RG41 from the 2003-06 period.
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
2003-05
2005-06
2006-07
2007-08
2008-09
2009-10
Post '10
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Construction
Total
Other Information
TIP Number: A446
Letting Date: FFY '05
PIN: 1757.03
Func. Class: NA
Project Type: Bike/Ped
Length: 2.3 Mi.
Jurisdiction: Town
Plan Ref.: NV
Location: Colonie (T)
No EIS Required
Implementer: Town
Air Quality: Exempt