Information for TIP Project Number A243

All funds are in millions of dollars.

Project Listings |  Clickable Maps |  Help

Project Description

Slingerlands Bypass (NY 85) Phase 3

Widen NY 85 from two to four lanes from the Albany City line to Blessing Road.

Includes corridor-level engineering and right-of-way acquisition.

Phase 1 is A349 from the 1999-04 TIP, and Phase 2 is A242 .

Final design (estimated at $1.0M) and construction (estimated at $10M) have no funding commitment from CDTC. Additional funding is dependent on identification of a fund source.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

2003-05

2005-06

2006-07

2007-08

2008-09

2009-10

Post '10

STP-Flex

0.154 P

0

0

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Engineering

0

0.154

Total

0

0.154



Other Information

TIP Number: A243

Letting Date: NA

PIN: 1125.19

Func. Class: UPA

Project Type: New Cons'n

Length: 2.65 Miles

Jurisdiction: State

Plan Ref.: Beth

Location: Bethlehem

EIS Required

Implementer: NYSDOT

Air Quality: Non-Exempt






CDTC Home Page   |  Site Map