Project Description
South Street from Hudson View Cemetary to Talmadge Park: Sidewalk Replacement & Handrail Repair Federal funding is 80%, with a maximum of $.020M. This project was funded as a drawdown on RG41 from the 2003-06 period.
Federal funding is 80%, with a maximum of $.020M. This project was funded as a drawdown on RG41 from the 2003-06 period.
This project was funded as a drawdown on RG41 from the 2003-06 period.
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
2001-03
2003-04
2004-05
2005-06
2006-07
2007-08
Post '08
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Construction
Total
Other Information
TIP Number: SA213
Letting Date: FFY '05
PIN: NA
Func. Class: UL
Project Type: Bike/Ped
Length: NA
Jurisdiction: City
Plan Ref.: NV
Location: Mechanicville
No EIS Required
Implementer: City
Air Quality: Exempt