Project Description
Scott Avenue (NY 150) from Prins Way to Ransom Avenue: Sidewalk Rehabilitation & New Construction Project includes new and rehabilitation of curbing. Federal funding is 80%, with a maximum of $.060M. This project was funded as a drawdown on RG41 from the 2003-06 period.
Project includes new and rehabilitation of curbing. Federal funding is 80%, with a maximum of $.060M. This project was funded as a drawdown on RG41 from the 2003-06 period.
Federal funding is 80%, with a maximum of $.060M. This project was funded as a drawdown on RG41 from the 2003-06 period.
This project was funded as a drawdown on RG41 from the 2003-06 period.
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
2001-03
2003-04
2004-05
2005-06
2006-07
2007-08
Post '08
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Construction
Total
Other Information
TIP Number: R251
Letting Date: FFY '05
PIN: NA
Func. Class: UC
Project Type: Bike/Ped
Length: NA
Jurisdiction: Village
Plan Ref.: NV
Location: Castleton (V)
No EIS Required
Implementer: Village
Air Quality: Exempt