Zim Smith Mid-County Trail Convert abandonded D&H railroad corridor
into bikeway and trialway. This includes grading, leveling, paving,
roadway crossings, two trailhead
endpoints and a new bridge over the
Mourningkill Federal funding is 80%, with a maximum
$0.686M federal share.