This includes the construction of two
sidewalk connectors; the first to
connect the Bridge of Hope to
the main business district and the
second to connect the Four
Corners to the Bow Bridge.
Federal funding is 80%, with a maximum
of $0.02205M.
This project was funded as a drawdown on
RG41
from the 2002-03 FFY.