Information for TIP Project Number SA190

All funds are in millions of dollars.
This listing includes the amendment for this project of 9/02.

Project Listings |  Clickable Maps |  Help

Project Description

Green Street Connector Sidewalk Reconstruction, Village of Schuylerville

Reconstruction of sidewalks along a two block stretch of Green Street, (approx. 2500 square feet) intersecting Saratoga Street and Ferry Street.

Federal funding is 80%, with a maximum of $0.024M. This project was funded as a drawdown on RG41 from the 2002-03 FFY.




Funding by Federal Fiscal Year (10/1 to 9/30)

Fund Source

1999-01

2001-02

2002-03

2003-04

2004-05

2005-06

Post '06

STP-Flex

0

0

0.032 C

0

0

0

0

Local

0

0

0.008 C

0

0

0

0



Funding Totals by Phase

Phase

Five-Year Funding

Seven-Year Funding

Construction

0.040

0.040

Total

0.040

0.040



Other Information

TIP Number: SA190

Letting Date: FFY '03

PIN: **

Func. Class: NA

Project Type: Bike/Ped

Length: NA

Jurisdiction: Village

Plan Ref.: NV

Location: Schuylerville

No EIS Required

Implementer: Village

Air Quality: Exempt






CDTC Home Page   |  Site Map