Project Description
Green Street Connector Sidewalk Reconstruction, Village of Schuylerville Reconstruction of sidewalks along a two block stretch of Green Street, (approx. 2500 square feet) intersecting Saratoga Street and Ferry Street. Federal funding is 80%, with a maximum of $0.024M. This project was funded as a drawdown on RG41 from the 2002-03 FFY.
Reconstruction of sidewalks along a two block stretch of Green Street, (approx. 2500 square feet) intersecting Saratoga Street and Ferry Street. Federal funding is 80%, with a maximum of $0.024M. This project was funded as a drawdown on RG41 from the 2002-03 FFY.
Federal funding is 80%, with a maximum of $0.024M. This project was funded as a drawdown on RG41 from the 2002-03 FFY.
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
1999-01
2001-02
2002-03
2003-04
2004-05
2005-06
Post '06
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Construction
Total
Other Information
TIP Number: SA190
Letting Date: FFY '03
PIN: **
Func. Class: NA
Project Type: Bike/Ped
Length: NA
Jurisdiction: Village
Plan Ref.: NV
Location: Schuylerville
No EIS Required
Implementer: Village
Air Quality: Exempt