Project Description
Station Lane Sidewalks, Saratoga Springs To be Bundled with SA163 or SA89 from the 1999 TIP Federal funding is 80%, with a maximum of $.029M. This project was funded as a drawdown on RG41 from the 2000-01 FFY.
To be Bundled with SA163 or SA89 from the 1999 TIP Federal funding is 80%, with a maximum of $.029M. This project was funded as a drawdown on RG41 from the 2000-01 FFY.
Federal funding is 80%, with a maximum of $.029M. This project was funded as a drawdown on RG41 from the 2000-01 FFY.
This project was funded as a drawdown on RG41 from the 2000-01 FFY.
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
1999-01
2001-02
2002-03
2003-04
2004-05
2005-06
Post '06
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Construction
Total
Other Information
TIP Number: SA179
Letting Date: FFY '00
PIN: **
Func. Class: NA
Project Type: Bike/Ped
Length: NA
Jurisdiction: City
Plan Ref.: NV
Location: Saratoga Springs
No EIS Required
Implementer: City
Air Quality: Exempt