Project Description
Spot Improvements for Bicycle and Pedestrian Access Set-Aside The following projects were funded as a drawdown on this project's 2000-01 FFY: A409 , A410 , A411 , A412 , A413 , A414 , SA177 , SA178 , SA179 , SA180 , S153 , S154 and S155 . The following projects were funded as a drawdown on this project's 2002-03 FFY: A422 , A423 , R228 , SA190 , SA191 , SA192 , SA193 , and S160 .
The following projects were funded as a drawdown on this project's 2000-01 FFY: A409 , A410 , A411 , A412 , A413 , A414 , SA177 , SA178 , SA179 , SA180 , S153 , S154 and S155 . The following projects were funded as a drawdown on this project's 2002-03 FFY: A422 , A423 , R228 , SA190 , SA191 , SA192 , SA193 , and S160 .
The following projects were funded as a drawdown on this project's 2002-03 FFY: A422 , A423 , R228 , SA190 , SA191 , SA192 , SA193 , and S160 .
Funding by Federal Fiscal Year (10/1 to 9/30)
Fund Source
1999-01
2001-02
2002-03
2003-04
2004-05
2005-06
Post '06
Funding Totals by Phase
Phase
Five-Year Funding
Seven-Year Funding
Engineering
Construction
Total
Other Information
TIP Number: RG41
Letting Date: NA
PIN: 1T07.58
Func. Class: NA
Project Type: Bike/Ped
Length: NA
Jurisdiction: Multiple
Plan Ref.: Bike
Location: Multiple
No EIS Required
Implementer: NYSDOT
Air Quality: Exempt